Module · Document checker
Catch line-item drift before you pay
ObraFinal cross-checks the signed proposal against the contractor's invoice. Increases, missing items and undisclosed extras are flagged with money attached.
6 discrepancies
Proposal total
424 mil €
P-2026-018
Invoice total
457 mil €
F-2026-074
Variance
33 mil €
8% over proposal
Negotiation lever
41 mil €
Total flagged amount
AIAI summary
6 flagged
Invoice exceeds the signed proposal by 32.500 € (8%). 2 new line items appear on the invoice that were never quoted. Two further items rose materially above their original price.
Proposal total
424.000 €
Invoice total
456.500 €
Flagged amount
40.900 €
Highlights
- Waterproofing increased €9,800 (+23%) — supplier change not approved in writing.
- Crane rental (€6,400) was never in the proposal — added as an extra without sign-off.
- Scaffolding +€3,200 (+18%) — duration extension not flagged before invoicing.
- Disposal fee (€2,900) added; original scope says contractor disposes at own cost.
Line-by-line
Comparison
Each row is the same item on both documents. Amber = increase, red = new extra, blue = missing from invoice.
AI matched 100% of items
Signed proposal
P-2026-018
Dated 2026-02-14
Contractor invoice
F-2026-074
Dated 2026-05-19
Line itemProposalInvoiceStatus
- Demolition & site prep28.000 €28.000 €Matched
- Structural reinforcement96.000 €96.000 €Matched
- Roof structure & tilesMaterial upgrade not approved in writing.154.000 €168.400 €+14.400 €Increased
- Waterproofing membraneSupplier switched without owner approval. Premium product.42.000 €51.800 €+9800 €Increased
- Electrical pre-installation78.000 €78.000 €Matched
- Crane rental — extrasNever quoted. Added as line item on invoice only.—6400 €+6400 €New extra
- Scaffolding rentalDuration extended +14 days. No change order on file.18.000 €21.200 €+3200 €Increased
- Site cleanupQuoted as included; missing from invoice. Verify before signing off.4200 €—Missing
- Permits & licenses3800 €3800 €Matched
- Waste disposal feeScope says contractor disposes at own cost. New extra.—2900 €+2900 €New extra
Totals424.000 €456.500 €Delta 32.500 €
Next
Approve, dispute, or send back
Approve clean items, dispute the flagged ones, or push the entire invoice back to the contractor with the discrepancy report attached.
Back to Control RoomDocument Checker · Step 1 of 1
Back to Control Room